The horizontal foundation insulation should be installed on the whole strip footing width, with at least 20 cm overlap. Correctly installed horizontal insulation plastomer does not require additional gluing or thermal sealing on connections because the wall pressure is sufficient to ensure correct insulation due to the film embossing. Confol Gamma insulation must be tightly joined to the Conbud waterproof layer. |
![]() |